Two weeks left until my due date?! I can hardly believe it.
Our hospital bags are packed, and waiting by the door.

They are waiting rather impatiently. (By the way, I realize that I never blogged about the Weekender Bag that I made in December 2006.  Oops!).
I finished my diaper bag, just under the wire :)

(Pardon the scowl, but this is the best shot out of many pictures).  As I mentioned in my previous post, this bag is a variation on the Everything Bag by Amy Butler.  It's slightly smaller than the original pattern, and I added a zipper at the top.  I've had this japanese fabric in my stash for a while, and love the fake french.  It's the french equivalent of engrish. 
And I did indeed finish the smaller-sized Baby Garter Kimono. 

And now I'm thinking that it might be too small.  I guess I'll have to bring both to the birthing center and see which one fits... 
Oh, and I snuck in a baby blanket!  Can you believe I didn't have a hand-knit baby blanket?!  I've had a few balls of Rowan Cotton Tape hanging out in my stash for a few years now, and I married them to the Garter Chevron pattern (February 26th in the knitting stitch calendar).  I swatched with one whole ball, calculated the area (in square inches) I could get out of that one ball, then figured out how many stitches I needed to cast on to make a square blanket.  Thankfully, on size 10.5 needles, it only took 3-4 days!
Labels: baby blanket, diaper bag, garter baby kimono